Jordan Station Private Side Disconnection Pilot Program

Share Jordan Station Private Side Disconnection Pilot Program on Facebook Share Jordan Station Private Side Disconnection Pilot Program on Twitter Share Jordan Station Private Side Disconnection Pilot Program on Linkedin Email Jordan Station Private Side Disconnection Pilot Program link

Consultation has concluded for this project, for the time being. Thank you to everyone who participated. 

About the Project

Weather patterns are changing, and the community is experiencing more severe storms. The Town of Lincoln is committed to adapting to the weather changes and protecting the safety of residents. Unfortunately, wet weather flow has exceeded the capacity of the Bridgeport Pumping Station, resulting in the homes in Jordan Station at risk of basement flooding. To reduce the risk of basement flooding, the Town has provided an emergency bypass pumping, resulting in excess wastewater flow directed to the environment. This aligns with the Niagara Region's decision to increase the pumping station's capacity to reduce overflows to the environment and increase the level of protection. The results of the Foundation Drain investigation showed the need to implement the Pilot Project.


Project Background

Since 2018 the Town has been working on reducing unwanted runoff and groundwater from entering the system. On April 20, 2022, Council approved the Jordan Station Sump Pump and Foundation Drain Disconnection Pilot Program and associated subsidies. This pilot program is an initiative by the Town of Lincoln to assist homeowners in reducing their risk of basement flooding by reducing the amount of stormwater entering the sanitary sewer system from private side sources.


Public Information Centre (PIC)

A PIC was held on June 7, 2022 to review the approved pilot disconnection program with residents. We will continue to update this page with any further public engagement opportunities for this project.



About the Project

Weather patterns are changing, and the community is experiencing more severe storms. The Town of Lincoln is committed to adapting to the weather changes and protecting the safety of residents. Unfortunately, wet weather flow has exceeded the capacity of the Bridgeport Pumping Station, resulting in the homes in Jordan Station at risk of basement flooding. To reduce the risk of basement flooding, the Town has provided an emergency bypass pumping, resulting in excess wastewater flow directed to the environment. This aligns with the Niagara Region's decision to increase the pumping station's capacity to reduce overflows to the environment and increase the level of protection. The results of the Foundation Drain investigation showed the need to implement the Pilot Project.


Project Background

Since 2018 the Town has been working on reducing unwanted runoff and groundwater from entering the system. On April 20, 2022, Council approved the Jordan Station Sump Pump and Foundation Drain Disconnection Pilot Program and associated subsidies. This pilot program is an initiative by the Town of Lincoln to assist homeowners in reducing their risk of basement flooding by reducing the amount of stormwater entering the sanitary sewer system from private side sources.


Public Information Centre (PIC)

A PIC was held on June 7, 2022 to review the approved pilot disconnection program with residents. We will continue to update this page with any further public engagement opportunities for this project.



  • Thank you for participating in the Jordan Station Private Side Disconnection Pilot Program Public Information Centre. The Town would like to ensure that questions and concerns relating to the pilot program are addressed to the best of our abilities. Should you have any additional questions or concerns that were not addressed during the Public Information Centre, please complete this comment sheet and contact the following:

     

    Gillian Harris, P.Eng., PMP                                     

    Associate Director, Public Works                              

    Town of Lincoln                                                         

    Email: gharris@lincoln.ca                                      

    Phone: 905-563-8205 ext. 286


    Danielle Anders, M.A.Sc., P.Eng.

    Project Manager, Partner 

    GM Blueplan Engineering 

    Email: danielle.anders@gmblueplan.ca

    Consultation has concluded for this project, for the time being. Thank you to everyone who participated. 

    Share Public Information Centre Comment Sheet on Facebook Share Public Information Centre Comment Sheet on Twitter Share Public Information Centre Comment Sheet on Linkedin Email Public Information Centre Comment Sheet link