Project Update
- All storm sewer related construction is complete.
- Complete additional interim road paving improvement work in Q4 2024.
- Monitor through the maintenance period.
- Jordan Station Reconstruction project to commence in 2029, subject to Council approval.
Project Background
In response to existing area drainage concerns and the need to accommodate the planned Royal Maple development, the Town has completed the detailed urbanization design for the Jordan Station area. The road reconstruction work is deferred until 2025. The storm sewer (Phase 1) works will commence separately to support the development by providing a proper stormwater outlet for the area to ensure the existing residents are not negatively affected impacted.
Project Description
To facilitate the construction of the storm sewer in advance of overall road construction, Phelps Homes Ltd. has entered into an external works agreement with the Town as part of the comprehensive site plan for the Royal Maple development. Trenchline and Roads Inc. will construct the storm sewer under a separate contract led by Phelps Homes. The Town will be involved throughout the construction, providing general project oversight and resident communication.
Proposed Storm Sewer Construction Improvements (Phase 1)
- Storm sewer installation
- Catch basin leads (future use)
- Sump pump lateral connections (future use)
- Asphalt trench reinstatement
Proposed Road Construction Improvements (Phase 2)
- Replacement of watermain
- Complete road reconstruction and road widening
- Concrete curbs and gutters
- Catch basin and sump pump final connections
- Sidewalk installation
- Upgraded roadway illumination
- Drainage improvements, including new culverts
- Landscaping and restoration
The project will align with several of the Town's plans, including: